FujiFilm CR-IR341 Service Manual page 257

Fuji computed radiography
Table of Contents

Advertisement

C
11
12
ONTENTS
12. Description of Initialization Self-Diagnostic
Steps and Shutdown Operation
General descriptions of initialization self-diagnostic steps and shutdown operation are
provided below.
Initialization Self-Diagnostic Steps
When the machine starts up, step numbers appear on the operation panel to indicate the
subsystems that are being initialized. If the machine hangs up during initialization, you can
locate a troubled subsystem by noting the displayed step number.
• Step 99: Panel control
• Step 95: Log information control
• Step 90: Conveyance control
• Step 80: Read control
• Step 70: DMS FINP output control
• Step 65: ID information input control
• Step 60: CSL control
• Step 55: Image distribution control
• Step 40: LP output control
• Step 35: DMS E-IF control
• Step 30: DMS FINP input control
• Step 15: Base on DICOM output control
• Step 5:
Shutdown operation
Information required by each subsystem when power is turned ON next time is written to the
backup memory or HD.
Control of the remote power supply unit is also executed as needed.
009-051-04
05.31.99 FM2460
Image management system control
CR-IR341 Service Manual
MD - 192
MD - 192

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cr-ir341pFcr 5000Fcr 5000plus

Table of Contents