FujiFilm CR-IR341 Service Manual page 158

Fuji computed radiography
Table of Contents

Advertisement

C
1
2
ONTENTS
(2) Sequence of Before-Erasure Conveyance
In this sequence, after path changeover in the erasure conveyor, the IP is fed from the
conveyance inverting stocker to the erasure section.
Fig. 2.9.2 Before-Erasure Conveyance
Preprocessing: Fig. 2.9.1
START
Conveyance changeover guide driving
DRIVE (SOLF1/ON)
DELAY TF13
Is SF2 closed within TF14?
N
Y
END
Path Changeover Mechanism
Guide
SOLF1
ON
SOLF1
IP path
009-051-04
05.31.99 FM2460
3
4
5
6
MF1 excitation OFF
Level 0 error
03D3
Conveyance error
(before erasure)
IP path
Guide
SOLF1
OFF
Guide
CR-IR341 Service Manual
7
8
9
10
Table 2.9.2 Operation Parameters
Symbol
PF12
Conveyance (before-erasure conveyance)
TF13
Wait for switchback
TF14
Before-erasure conveyance IP leading-edge
detection timeout
Before-erasure driving
DRIVE(MF1/PF12)
Is SF1 opened?
N
Y
END
Inverting Stocker
IP inverting stocker
(located under
the top frame)
FRONT
IP path
FR1H0370.EPS
MD - 95
Description
TR1H0040.EPS
MF1 excitation OFF
Forced terminationof reading
Level 0 error
03D4
Branch path changeover
guide operation error
FR1H0369.EPS
FR1H0371.EPS
MD - 95
Value
1,044 p
0.2 sec
2 sec

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cr-ir341pFcr 5000Fcr 5000plus

Table of Contents