FujiFilm CR-IR341 Service Manual page 157

Fuji computed radiography
Table of Contents

Advertisement

C
1
2
ONTENTS
2.9 Erasure
(1) Overall/General Sequence
This is for the operation of the erasure conveyor.
In this sequence, the path of the erasure conveyor is changed over to feed the IP in the
inverting stocker to the erasure conveyor where the IP data is erased.
The erasure lamp is lit (turned on), if unlit, once the IP length measurement is completed
normally.
Meanwhile, the erasure lamp is unlit (turned off) if the second IP is not in the feed condition
at the end of erasure conveyance.
Fig. 2.9.1 Erasure (Overall Sequence)
After path changeover, the IP is
loaded from the inverting stocker to
the erasure conveyor.
The data of the IP conveyed
is erased.
Relationship between Conveyance Path and IP Operation
IP
SF4
SF2
SF1
During before-erasure conveyance
009-051-04
05.31.99 FM2460
3
4
5
6
Preprocessing: Fig. 2.1.1
START
N
Y
Y
Erasure lamp
turn-off
END
SB2
SF3
SC2
SC1
BCR
SZ1SD3
CR-IR341 Service Manual
7
8
9
10
Is the after-reading conveyance permitted?
After-reading conveyance
Before-erasure conveyance
Fig.2.9.2
Erasure conveyance
Fig.2.9.3
Is only one IP left in the machine?
N
Two IPs
One IP
Erasure lamp turn-off and preheating
DRIVE (LAMP1-5/preheating)
SF4
SF3
SF2
SF1
SZ1SD3
During after-erasure conveyance
MD - 94
IP feed conveyance
permission OK
(Sequence initiation requirement)
If the following requirement is met
as logic, the sequence is initiated.
After-reading conveyance
permission OK: Fig. 2.10.1
FR1H0367.EPS
SB2
SC2
SC1
BCR
IP
FR1H0368 EPS
MD - 94

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cr-ir341pFcr 5000Fcr 5000plus

Table of Contents