Checking, Replacing, And Adjusting Side-Positioning Conveyor - FujiFilm CR-IR341 Service Manual

Fuji computed radiography
Table of Contents

Advertisement

C
1
2
ONTENTS
8.12 Checking, Replacing, and Adjusting Side-Positioning
Conveyor IP Conveyance Timing Belt
Checks
(1) Remove the side-positioning conveyor.
"8.1 Removing and Reinstalling Side-Positioning Conveyor"
(2) Put a sheet or the like on the floor and place the side-positioning conveyor down on
the sheet, with its side down.
(3) Measure the distance "A" of the timing belt.
(4) With a load of 500±50 g applied to the timing belt, measure the distance "B".
Tension roller
Tension roller
A - B = 9–1(mm)
(5) Make sure that the deflection (A - B) is 9±1 mm.
(6) Reinstall the side-positioning conveyor.
"8.1 Removing and Reinstalling Side-Positioning Conveyor"
009-051-04
05.31.99 FM2460
3
4
5
6
500–50g
CR-IR341 Service Manual
7
8
9
10
MD1
A
Timing belt
Push-pull gauge
MD1
B
Timing belt
MC - 127
T
O
P
T
O
P
FR1H1790.EPS
MC - 127

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cr-ir341pFcr 5000Fcr 5000plus

Table of Contents