C
1
2
ONTENTS
(8) Secure MB1 in place with three hex socket head bolts.
At this time, put the timing belt onto the timing belt wheel.
(9) Connect the connector (CNMB1).
(10) Install the bracket.
(11) Put the cable clamp back where it was.
NOTE
After putting the cable clamp back where it was, make sure that the motor cable does
not interfere with the vertical conveyor and so forth by allowing the IP removal unit to
move up and down.
009-051-04
05.31.99 FM2460
3
4
5
6
CR-IR341 Service Manual
7
8
9
10
MC - 74
MC - 74