2.10 IP Load
(1) Overall/General Sequence
This is for the operation of the IP removal unit.
In this sequence, the IP fed via the side-positioning conveyor and erasure conveyor is
loaded into the cassette.
Fig. 2.10.1 IP Load (Overall Sequence)
The IP that has been erased is conveyed
via the before-side-positioning conveyor to
the up-down IP removal unit.
The IP is conveyed to the cassette inlet.
The IP conveyed is sucked by the suction
cups.
The IP sucked is loaded into the cassette.
It is checked if the IP loaded has been
processed normally.
Relationship between Conveyance Path and IP Driving
SF4
SF2
SF1
At the start of IP load conveyance
009-051-04
05.31.99 FM2460
3
4
5
6
Preprocessing: Fig. 2.1.1, Fig. 3.1.1, and Fig. 5.4.3
SB2
IP
SF3
SC2
SC1
BCR
SZ1SD3
CR-IR341 Service Manual
7
8
9
10
START
Is the IP load permitted?
N
Y
After-erasure
conveyance
Fig. 2.9.4
Load conveyance
Fig. 2.10.2
Load suction
Fig. 2.10.3
Load suction conveyance
Fig. 2.10.4
Erasure check
Fig. 2.10.5
END
SF4
SF3
SF2
SF1
SZ1SD3
At the end of IP load conveyance
MD - 98
(Sequence initiation requirement)
When the following requirement is
et, the sequence starts.
¥ IP load permission OK: Fig. 2.8.1
After-reading conveyance
permission OK
To the sequence
initiation requirement
in Fig. 2.9.1
SB2
IP
SC2
SC1
BCR
FR1H0376.EPS
MD - 98
FR1H0375.EPS