Mounting Instructions For Sealings - ABB IRB 6700Inv Series Product Manual

Hide thumbs Also See for IRB 6700Inv Series:
Table of Contents

Advertisement

4.2.3 Mounting instructions for sealings

General
This section describes how to mount different types of sealings.
Equipment
Consumable
Grease
Rotating sealings
The procedure below describes how to fit rotating sealings.
1
2
3
Product manual - IRB 6700Inv
3HAC058254-001 Revision: L
CAUTION
Please observe the following before commencing any assembly of sealings:
Protect the sealing during transport and mounting, especially the main lip.
Keep the sealing in its original wrappings or protect it well before actual
mounting.
The fitting of sealings and gears must be carried out on clean workbenches.
Use a protective sleeve for the main lip during mounting, when sliding over
threads, keyways or other sharp edges.
Action
Check the sealing to ensure that:
The sealing is of the correct type.
There is no damage on the main lip.
Inspect the shaft surface before mounting. If scratches
or damage are found, the shaft must be replaced since
it may result in future leakage. Do not try to grind or
polish the shaft surface to get rid of the defect.
Lubricate the sealing with grease just before fitting.
(Not too early - there is a risk of dirt and foreign
particles adhering to the sealing.)
Fill 2/3 of the space between the dust lip and the main
lip with grease. If the sealing is without dust lip, just
lubricate the main lip with a thin layer of grease.
© Copyright 2017 - 2020 ABB. All rights reserved.
4.2.3 Mounting instructions for sealings
Article number
Note
3HAC042536-001
Shell Gadus S2
Note
Article number is specified in
Equipment on page
xx2000000071
4 Repair
187.
B
A
A Main lip
B Grease
C Dust lip
Continues on next page
C
187

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 6700inv - 300/2.60Irb 6700inv - 245/2.90Irb 6700invIrb 6700i

Table of Contents