ABB IRB 6700Inv Series Product Manual page 650

Hide thumbs Also See for IRB 6700Inv Series:
Table of Contents

Advertisement

4 Repair
4.8.4 Replacing the axis-3 gearbox
Continued
7
Preparations before removing the upper arm
1
2
Continues on next page
650
Action
Remove the lifting sling between the upper
arm and the balancing device.
Action
Remove two attachment screws in opposite
holes and replace them with guide pins.
Note
Make sure that it is the screws that hold
the lower arm to the axis-3 gearbox that
are removed!
Tip
Lubricate the guide pins with some grease
to make the upper arm slide better.
Leave one of the remaining attachment
screws fitted, remove the other screws.
© Copyright 2017 - 2020 ABB. All rights reserved.
Note
xx1800000047
Note
Guide pin, M16x150: 3HAC13120-2
Guide pin, M16x200: 3HAC13120-3
Always use guide pins in pairs.
xx1700000457
xx1700000458
Product manual - IRB 6700Inv
3HAC058254-001 Revision: L

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 6700inv - 300/2.60Irb 6700inv - 245/2.90Irb 6700invIrb 6700i

Table of Contents