ABB IRB 6700Inv Series Product Manual page 463

Hide thumbs Also See for IRB 6700Inv Series:
Table of Contents

Advertisement

4
5
6
7
8
9
10
11
12
Product manual - IRB 6700Inv
3HAC058254-001 Revision: L
Action
Connect the 24 VDC power supply to release the
brakes.
Connect to R2.MP1-connector:
+ = pin 2
- = pin 5
Note
Put the cables to the brake release tool through
the hole in the tool shelf.
Fit guide pins in opposite holes.
Apply 3 gram grease on the splines before fitting.
Put the motor on the tool shelf and rotate it into
position.
CAUTION
Whenever parting/mating motor pinion and hub,
the splines may be damaged if excessive force is
used.
Raise the revolving handle to assemble motor.
Make sure that the motor pinion is properly
mated into the hub.
Make sure that the motor pinion does not
get damaged.
Make sure that the direction of the cable
exit is facing the correct way.
Secure the motor with its attachment screws and
washers.
Use a bits extender to reach the screws.
Perform a leak-down test (if not already done).
Disconnect the 24 VDC power supply.
© Copyright 2017 - 2020 ABB. All rights reserved.
4 Repair
4.7.1 Replacing the axis-1 motor
Continued
Note
Guide pin, M10x150: 3HAC15521-
2
Always use guide pins in pairs.
Grease: Castrol Molub. Alloy 777-
1 NG
xx1500002346
Bits extender: 3HAC12342-1
Tightening torque: 50 Nm.
Screw dimension : M10x40 quality
12.9 Gleitmo (4 pcs)
See
Performing a leak-down test
on page
184.
Continues on next page
463

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 6700inv - 300/2.60Irb 6700inv - 245/2.90Irb 6700invIrb 6700i

Table of Contents