Prepare Controller For Commissioning - Lenze L-force HighLine C 8400 Series Reference Manual

Inverter drives
Hide thumbs Also See for L-force HighLine C 8400 Series:
Table of Contents

Advertisement

3.7.1

Prepare controller for commissioning

1. Power connection wiring
– Refer to the mounting instructions supplied with the drive controller to find help on
how to correctly design the power connections to match the requirements of your
device.
2. Wire the control connections
– The system constellation including position encoder and hardware limit switches
shown in illustration
3. Inhibit controller: Set terminal X5/RFR to LOW level or open contact.
4. Connect USB diagnostic adapter.
5. Switch on voltage supply of the controller.
– Without motor operation: Connect external 24 V supply.
– With motor operation: Connect mains voltage.
If the green "DRV-RDY" LED is blinking and the red "DRV-ERR" LED is off, the controller is
ready for operation and commissioning can proceed.
Related topics:
Automatic restart after mains connection/fault...
LED status displays
Firmware ≤ 11.00 - DMS 6.0 EN - 10/2011
Buy: www.ValinOnline.com | Phone 844-385-3099 | Email: CustomerService@valin.com
8400 HighLine C | Reference manual
Commissioning of the "Table positioning" technology application
[3-2]
requires wiring according to control mode
External supply 24 V DC
Controller enable
Position encoder
pos. direction
Limit switch
neg. direction
Profile no. 0 ... 3
Start profile generation
( 560)
L
X5
+
24E
=
24I
RFR
DI1
A
DI2
B
DI3
DI4
Bit 2
DI5
Bit 1
DI6
DI7
GI
( 122)
Commissioning
"Terminals
0":
69

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

L-force highline e84avhc series

Table of Contents