Designating the Master Unit
Log in to the PDU you want to designate as the master unit. When you add the
first link unit, a chain is established between the master and the new link, and
the master becomes ID "1".
To view and manage a link chain, log in to the master unit, as displayed on the
PDU page:
The PDU page displays the following information about the master PDU:
1.
Firmware version
2.
Model
3.
Serial number
4.
MAC address
5.
Rating
The ID of the master unit is automatically assigned the ID "1", as shown in the
example as "My PDU (1)". The ID cannot be edited.
Chapter 5: PDU Linking
79