ABB IRB 1200 Product Manual page 689

Hide thumbs Also See for IRB 1200:
Table of Contents

Advertisement

Removing the gear unit
Preparations before removing the axis-4 gear unit
1
2
3
4
Getting access to inside of the wrist unit
1
Product manual - IRB 1200
3HAC046983-001 Revision: S
4.6.4 Replacing the axis-4 gearbox, drive shaft and pulley
Action
Decide which calibration routine to use, and take
actions accordingly prior to beginning the repair
procedure.
Jog all axes to zero position.
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot working
area.
CAUTION
For robots with protection type Clean Room
For robots with food grade lubrication
For robots with protection type Hygienic
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See
Cut the paint or surface on the robot before
replacing parts on page
158.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
© Copyright 2014 - 2021 ABB. All rights reserved.
4 Repair
Continued
Note
xx1300002581
Note
Continues on next page
689

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 1200-5/0.9Irb 1200-7/0.7

Table of Contents