ABB IRB 1200 Product Manual page 760

Hide thumbs Also See for IRB 1200:
Table of Contents

Advertisement

4 Repair
4.6.7 Replacing the axis-5 motor with pulley
Continued
Removing the motor with pulley
Preparations before removing the axis-5 motor, pulley or shaft
1
2
3
4
Continues on next page
760
Action
If the robot is to be calibrated with fine
calibration:
Remove all external cable packages
(DressPack) and tools from the robot.
Action
Decide which calibration routine to use, and take
actions accordingly prior to beginning the repair
procedure.
Jog all axes to zero position.
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot working
area.
CAUTION
For robots with protection type Clean Room
For robots with food grade lubrication
For robots with protection type Hygienic
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See
Cut the paint or surface on the robot before
replacing parts on page
© Copyright 2014 - 2021 ABB. All rights reserved.
Note
158.
Note
xx1300002581
Product manual - IRB 1200
3HAC046983-001 Revision: S

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 1200-5/0.9Irb 1200-7/0.7

Table of Contents