ABB IRB 1200 Product Manual page 720

Hide thumbs Also See for IRB 1200:
Table of Contents

Advertisement

4 Repair
4.6.4 Replacing the axis-4 gearbox, drive shaft and pulley
Continued
7
8
9
Preparations before securing the axis-5 motor
1
2
Continues on next page
720
Action
Put the cables through the plate hole and refit the
plate.
Reconnect the air hoses.
CAUTION
Make sure to connect the air hoses correctly, ac-
cording to the marking on hoses and connectors.
Reconnect the connectors.
R3.Eth
R3.CPCS
Action
For robots with protection type Clean Room
For robots with food grade lubrication
For robots with protection type Hygienic
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free.
Check that:
all assembly surfaces are clean and without
damages
the motor is clean and undamaged.
© Copyright 2014 - 2021 ABB. All rights reserved.
Note
Tightening torque: 0.3 Nm.
xx1300002356
xx1300002355
xx1300002353
Note
Product manual - IRB 1200
3HAC046983-001 Revision: S

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 1200-5/0.9Irb 1200-7/0.7

Table of Contents