ABB IRB 1200 Product Manual page 6

Hide thumbs Also See for IRB 1200:
Table of Contents

Advertisement

Table of contents
3
3.1
Introduction ......................................................................................................
3.2
Maintenance schedule .......................................................................................
3.2.1
Specification of maintenance intervals ........................................................
3.2.2
Maintenance schedule .............................................................................
3.3
Inspection activities ...........................................................................................
3.3.1
Inspecting the robot paint .........................................................................
3.3.2
Inspecting the robot cabling .....................................................................
3.3.3
Inspecting the information labels ................................................................
3.3.4
Inspecting mechanical stops ....................................................................
3.3.5
Inspecting timing belts ............................................................................
3.3.6
Inspecting the signal lamp (option) .............................................................
3.4
Replacement/changing activities ..........................................................................
3.4.1
Replacing the battery pack .......................................................................
3.4.2
3.5
Cleaning activities .............................................................................................
3.5.1
Cleaning the IRB 1200 ..............................................................................
3.5.2
Cleaning the IRB 1200 with protection type Hygienic ......................................
4
4.1
Introduction ......................................................................................................
4.2
General procedures ...........................................................................................
4.2.1
4.2.2
Mounting instructions for sealings ..............................................................
4.2.3
Sealing differences depending on protection class ........................................
4.2.4
4.3
Cable harness ..................................................................................................
4.3.1
Replacing the main cable package .............................................................
4.3.2
.............................................................................................................
4.3.3
Replacing the axis-5 FPC unit ...................................................................
4.3.4
Replacing the EIB/SMB unit ......................................................................
4.4
Upper and lower arms ........................................................................................
4.4.1
Replacing the lower arm ..........................................................................
4.4.2
Replacing the signal lamp ........................................................................
4.4.3
Replacing the tubular spare parts ..............................................................
4.4.4
Replacing the axis-3 radial sealing and sealing ring ......................................
4.4.5
Replacing the axis-2 mechanical stop .........................................................
4.4.6
Replacing the axis-3 mechanical stop .........................................................
4.4.7
Replacing the axis-4 mechanical stop .........................................................
4.5
Swing and base ................................................................................................
4.5.1
4.5.2
4.5.3
Replacing the axis-1 mechanical stop .........................................................
4.6
Motors and gearboxes .......................................................................................
4.6.1
Replacing the axis-1 gear unit ....................................................................
4.6.2
Replacing the axis-2 drive unit ..................................................................
4.6.3
Replacing the axis-3 drive unit ..................................................................
4.6.4
Replacing the axis-4 gearbox, drive shaft and pulley .....................................
4.6.5
Replacing the axis-4 motor with pulley .......................................................
4.6.6
Replacing the axis-4 timing belt .................................................................
4.6.7
Replacing the axis-5 motor with pulley .......................................................
4.6.8
Replacing the axis-5 timing belt .................................................................
4.6.9
Replacing the axis-5 and axis-6 drive unit ...................................................
5
5.1
Introduction to calibration ...................................................................................
5.1.1
Introduction and calibration terminology ......................................................
6
© Copyright 2014 - 2021 ABB. All rights reserved.
115
115
116
116
117
119
119
120
121
126
129
132
134
134
144
149
149
152
157
157
158
158
161
164
165
169
169
245
277
291
308
308
377
380
418
454
457
460
492
492
572
638
641
641
642
664
686
728
740
758
771
778
805
805
805
Product manual - IRB 1200
3HAC046983-001 Revision: S

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 1200-5/0.9Irb 1200-7/0.7

Table of Contents