4 Repair
4.4.3 Replacing the tubular spare parts
Continued
4
5
6
Removing the wrist
1
Continues on next page
396
Action
Remove the timing belt.
Snap loose and disconnect the axis-5 FPC
connectors.
Remove the screws and pull out the motor.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
© Copyright 2014 - 2021 ABB. All rights reserved.
Note
xx1300002351
xx1300002390
xx1300002352
Note
Product manual - IRB 1200
3HAC046983-001 Revision: S