ABB IRB 1200 Product Manual page 229

Hide thumbs Also See for IRB 1200:
Table of Contents

Advertisement

3
4
5
Product manual - IRB 1200
3HAC046983-001 Revision: S
Action
Guide the cable package into the upper arm,
through the housing.
Note
Guide the air hoses (A) underneath the bottom
side of the axis-3 motor and the axis-3 motor
cables (B) on top of the motor, see cable layout
figure. The fix point of the air hoses is pre-determ-
ined (marked) and must be matched against the
air hose holder on the left side of the axis-3 motor.
Note
The air hose holder keeps the air hoses arranged
in an optimized way. It is necessary to keep the
air hose holder vertically and firmly against the
left side of the axis-3 motor.
Refit the bracket to the sheet with two screws.
CAUTION
Do not loosen the cable clamp screw! There is a
risk of rearrangement of the cable layout which
would result in shortened lifetime of the cable
harness.
Refit the fix sheet to the motor.
© Copyright 2014 - 2021 ABB. All rights reserved.
4.3.1 Replacing the main cable package
Note
xx1400001472
Tightening torque: 1.5 Nm.
xx1300002424
Tightening torque: 1.5 Nm.
xx1300002423
Continues on next page
4 Repair
Continued
229

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 1200-5/0.9Irb 1200-7/0.7

Table of Contents