ABB IRB 6700 Series Product Manual page 413

Table of Contents

Advertisement

8
Preparations before refitting the upper arm
1
2
3
Product manual - IRB 6700
3HAC044266-001 Revision: N
Action
Remove the lifting accessory from the
lower arm.
Action
Wipe clean all contact surfaces.
Foundry Plus:
Apply Mercasol on the surface on the lower
arm as shown in the figure.
CAUTION
Keep the sealing surfaces clean from Mer-
casol.
IRB 6700 - 235/2.65, IRB 6700 - 205/2.80,
IRB 6700 - 175/3.05, IRB 6700 - 150/3.20
Fit two guide pins in opposite M12 holes
in the axis-3 gearbox.
Tip
Lubricate the guide pins with some grease
to make the upper arm slide better.
© Copyright 2013 - 2018 ABB. All rights reserved.
4.5.5 Replacing the lower arm
Note
Note
Rust preventive: 3HAC034903-001 (Mer-
casol 3110 Waxcoat. Recommended drying
time is 24h.)
xx1700001880
Guide pin, M12x150: 3HAC13056-2
Guide pin, M12x200: 3HAC13056-4
Always use guide pins in pairs.
xx1700000058
Continues on next page
4 Repair
Continued
413

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents