ABB CRB 15000 Product Manual page 579

Hide thumbs Also See for CRB 15000:
Table of Contents

Advertisement

3
4
Replacing the tubular
1
Refitting the tubular
Use these procedures to refit the tubular.
Preparations before fitting the joint unit
1
Product manual - CRB 15000
3HAC077389-001 Revision: L
Action
Press the tilt out of position using two of the pre-
vious attachment screws as removal tools.
Remove the tilt from the tubular.
Assist the cabling to be removed while lifting away
the complete tilt.
Place the tilt on a workbench.
Action
Replace the tubular.
Action
ELECTROSTATIC DISCHARGE (ESD)
The unit is sensitive to ESD. Before handling the
unit read the safety information in section
unit is sensitive to ESD on page
© Copyright 2021 - 2023 ABB. All rights reserved.
5.4.3 Replacing the tubular
Note
xx2000002131
Note
Tubular: 3HAC074509-001 (for
CRB 15000-5/0.95)
Tubular: 3HAC083685-001 (for
CRB 15000-10/1.52)
Tubular: 3HAC081054-001 (for
CRB 15000-12/1.27)
Note
The
53.
5 Repair
Continued
Continues on next page
579

Advertisement

Table of Contents
loading

Table of Contents