Removing the axis-6 joint unit
1
2
3
Product manual - CRB 15000
3HAC077389-001 Revision: L
Action
Fit the lifting aid to the joint unit, on the torque
sensor side.
CAUTION
The connectors and the joint unit cables are
sensitive to mechanical damage. Handle the as-
sembly with care.
Remove two attachment screws.
Dispose the screws.
New screws are included in the spare part delivery
of the joint unit.
Fit two guide pins to the axis-6 joint unit.
© Copyright 2021 - 2023 ABB. All rights reserved.
5.3.6 Replacing the axis-5 cabling
Note
Lifting aid: 3HAC077789-001
Screws: M3x12 (4 pcs)
xx2000002168
Position shown in the figure shows
axis 5 jogged to +20°, which is a
more convenient position when re-
placing only the axis-6 joint unit.
xx2000002170
Position shown in the figure shows
axis 5 jogged to +20°, which is a
more convenient position when re-
placing only the axis-6 joint unit.
Guide pin, M3x110: 3HAC077787-
001
Always use guide pins in pairs.
For joint units on axes 4, 5 and 6.
xx2100000328
Continues on next page
5 Repair
Continued
429