Cable Harness; Replacing The Base Cabling - ABB CRB 15000 Product Manual

Hide thumbs Also See for CRB 15000:
Table of Contents

Advertisement

5.3 Cable harness

5.3.1 Replacing the base cabling

Location of the cable harness
The cable harness is located as shown in the figure.
xx2100000056
Summary of the replacement procedure
This is a brief summary of the replacement procedure, containing the major actions
to be performed.
Product manual - CRB 15000
3HAC077389-001 Revision: L
1 Jog the robot to transportation position.
2 Loosen the robot from the foundation and lay it down on its back.
For CRB 15000-5/0.95, this step requires two persons.
For CRB 15000-10/1.52 and CRB 15000-12/1.27, the robot requires to
be lifted using lifting roundslings.
3 Remove the base cover.
4 Replace the cabling.
© Copyright 2021 - 2023 ABB. All rights reserved.
5 Repair
5.3.1 Replacing the base cabling
Continues on next page
205

Advertisement

Table of Contents
loading

Table of Contents