ABB CRB 15000 Product Manual page 738

Hide thumbs Also See for CRB 15000:
Table of Contents

Advertisement

5 Repair
5.5.2 Replacing the swing
Continued
3
4
5
Removing the base from foundation (-10/1.52 and -12/1.27)
1
2
Continues on next page
738
Action
Remove the functional and protective earth cables
by removing the screw.
Snap loose and disconnect the connectors:
J2.DC+
J2.DC-
J2.CS
J2.CP
Disconnect the connectors from the drive board.
D2.X1 from X1
D2.DC+ from DC+
D2.DC- from ground
D2.X4 from X4
D2.X2 from X2
D2.X5 from X5
CAUTION
Use tweezers to unlock connectors and pull them
off.
Action
CAUTION
The weight of the complete swing and base
together is xxx
WARNING
Personnel must not, under any circumstances,
be present under the suspended load.
© Copyright 2021 - 2023 ABB. All rights reserved.
Note
xx2000001945
xx2000001944
xx2000002013
Note
Product manual - CRB 15000
3HAC077389-001 Revision: L

Advertisement

Table of Contents
loading

Table of Contents