ABB CRB 15000 Product Manual page 687

Hide thumbs Also See for CRB 15000:
Table of Contents

Advertisement

Securing the base
1
Refitting the swing(-5/0.95)
1
2
Product manual - CRB 15000
3HAC077389-001 Revision: L
Action
Lift the base to standing and secure it to the
foundation with the attachment screws and
washers.
Action
Clean the mounting surface with isopropanol.
Apply flange sealant to the corner of the base
mounting surface, as pointed out in the figure.
Separate the new swing parts by removing the
pre-assembling screws.
© Copyright 2021 - 2023 ABB. All rights reserved.
5 Repair
5.5.1 Replacing the base
Continued
Note
Attachment screws: M10x35 8.8 (4
pcs).
Washers: 23/10.5/2.5 mm Steel (4
pcs).
Tightening torque: 32 Nm ±10%.
xx2000002006
Note
Cleaning agent: Isopropanol
Flange sealant: Loctite 574
xx2000001990
Continues on next page
687

Advertisement

Table of Contents
loading

Table of Contents