ABB CRB 15000 Product Manual page 293

Hide thumbs Also See for CRB 15000:
Table of Contents

Advertisement

Consumable
O-ring
O-ring
O-ring
O-ring
O-ring
Cleaning agent
Flange sealant
Grease
Removing the joint cabling (-5/0.95)
Use these procedures to remove the joint-2 cabling.
Preparations before removing the cabling
1
2
Product manual - CRB 15000
3HAC077389-001 Revision: L
Action
Jog the robot to the specified position:
Axis 1: 0°
Axis 2: 0° (home position)
Axis 3: +60°
Axis 4: 0°
Axis 5: -90°
Axis 6: No significance.
CAUTION
Jog the axis on which the joint unit is to be re-
placed to home position, to achieve correct cable
routing during replacement of the joint unit.
CAUTION
Turn off all supplies for electrical power to the
robot, before starting the repair work.
© Copyright 2021 - 2023 ABB. All rights reserved.
5.3.3 Replacing the axis-2 cabling
Article number
Note
3HAC061327-075
Lower arm, lower inner cover of
CRB 15000-10/1.52 and CRB
15000-12/1.27.
Replace if damaged.
3HAC061327-047
Cover for axis 2/3, used for CRB
15000-5/0.95.
Replace if damaged.
3HAC061327-074
Swing cover, used for CRB
15000-10/1.52 and CRB 15000-
12/1.27.
Replace if damaged.
3HAB3772-64
Base cover, used for CRB 15000-
5/0.95.
3HAC061327-072
Base cover, used for CRB 15000-
10/1.52 and CRB 15000-12/1.27.
-
Isopropanol
-
Loctite 574
3HAC042536-001
Shell Gadus S2
Note
xx2100000044
5 Repair
Continued
Continues on next page
293

Advertisement

Table of Contents
loading

Table of Contents