Step 5: Start Test Or Measurement - Omron F250-UME Software Manual

Table of Contents

Advertisement

Basic Operations
1-6-5

STEP 5: Start Test or Measurement

1-6-5-1
Entering Monitor Mode
This section explains how to check if measurements are being correctly per-
formed with the set measurement conditions using Monitor Mode, and how to
make actual measurements using Run Mode.
Use the following procedure to check that measurements are being correctly
performed with the set measurement conditions.
1.
Display the Set Mode Screen.
0.Scn 0=SET=
0.Camera image
1.Fine matching
2.
ENT:Set SFT+ESC:Edit
2.
Press the ESC Key to leave Set Mode and enter Monitor Mode.
0.Scn 0
---- ---ms
MON
Image 0 freeze
Section 1-6