Cna-Testplug-Service - Avaya G250 Reference

Cli reference
Hide thumbs Also See for G250:
Table of Contents

Advertisement

CLI Commands
Example
To enter the test plug context:
G350-003# cna-testplug 1
G350-003(cna-testplug 1)#
Related commands
clear counters (CNA test
scheduler,
show cna

cna-testplug-service

Use the cna-testplug-service command to enable the CNA test plug service on the
gateway. Use the no form of the command to disable CNA test plug service on the gateway. In
order to enable the test plug, both the test plug and the test plug service must be enabled. Use
the shutdown and no shutdown commands in the test plug context to disable/enable the test
plug itself.
Syntax
cna-testplug-service
User level
admin
Context
general
Example
To enable the CNA test plug service:
G350-003# cna-testplug-service
The Converged Network Analyzer test plug is enabled.
Related commands
clear counters (CNA test
scheduler,
show cna
98 Avaya G250 and Avaya G350 CLI Reference
plugs), cna-testplug-service, control-port, rtp-echo-port, rtp-test-port,
testplug,
shutdown (CNA test
plugs), cna-testplug, control-port, rtp-echo-port, rtp-test-port,
testplug,
shutdown (CNA test
plugs),
test-rate-limit
plugs),
test-rate-limit

Advertisement

Table of Contents
loading

This manual is also suitable for:

G350

Table of Contents