Common Tasks; Common Tasks Overview - VeEX MPA User Manual

Multi-protocol analyzer
Table of Contents

Advertisement

MPA_e_manual_D07-00-129P_RevA00
Getting Started
7. Pull out the Unlock/Extraction handle (to the first stop position) on the SCM-
210 card, and wait for its hot-swap LED to turn solid blue.
6. Proceed with the rest of the
Reboot
1. When Reboot is selected, a Reboot the Unit window appears giving you the
option to select OK or Cancel.
2. Selecting OK will begin the Reboot process, which may take several minutes to
complete.
3. The Remote GUI will automatically disconnect from the MPA unit, and close.
4. After waiting about 5 minutes or so, the Remote Client software should be able to
reconnect with the rebooted MPA system.

Common Tasks

Common Tasks Overview

This section lists common tasks that are performed the same for each protocol
processor mode. For tasks that are protocol processor specific, refer to the appropriate
protocol processor section.
65
MPA Shutdown
Procedure.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents