Download Print this page

Ferrari California Workshop Manual page 355

Hide thumbs Also See for California:

Advertisement

Refit the alternator (
Refit the GDI injection rail pipes (
Refit the intake manifold (
Connect the battery (
Fill the cooling system (
Fill the engine lubrication system (
Fill to the correct level.
F2.04).
F3.19).
B4.04).
F2.01).
A3.07).
A3.01).
Lay the engine services cable (4) as originally
fitted on the heat exchanger.
Fasten the engine services cable (4) to the heat
exchanger by closing the indicated clamps.
Place the injection cables on top of the heat
exchanger as originally fitted.
Connect the connector (1).
Connect the connector (2).
Connect the connectors (3).
Fit and fasten the clamp, tightening the indicated
screw.

Advertisement

loading