Connect the pipe (22) to the expansion tank,
fitting and tightening a new collar (21).
Connect the hose union (19) to the pipe (20).
Connect the hose union (18) to the evaporative
emissions control system solenoid valve,
fitting and tightening the collar indicated.
Connect the pipe (17) to the secondary air pump.
Tighten the hose clamp (16).