Description Of The Measure To Line/Stake To Line Tasks - Leica Captivate Technical Reference Manual

Table of Contents

Advertisement

Task
566
The lines are stored in the selected design job.
The measurements are stored to the selected job.
The coordinate systems in the design job and in the job must match, otherwise
a warning message appears to prevent any further step.
Key
Description
OK
To select the highlighted option and to continue with the
subsequent panel.
Fn Settings
To configure the Measure to line/Stake to line app.

Description of the Measure to line/Stake to line tasks

For Measure to line
Task
Description
Line
Measure relative to a line by viewing the distance, offset &
height values.
Line with
Measure relative to a line by viewing the distance, offset &
slope
height values. Additionally view position relative to a defined
slope from the line.
Segment
Measure relative to a line segment by viewing the distance,
offset & height values. A segment may be an individual
straight or arc, or a segment within a line.
Segment
Measure relative to a line segment by viewing the distance,
with slope
offset & height values. Additionally view position relative to a
defined slope from the line.
Quick Line
Create a temporary line from 2 points & measure relative to
it by viewing the distance, offset & height values.
For Stake to line
Task
Description
Line
Stakeout relative to a line by defining the distance, offset &
height.
Line with
Stakeout relative to a line by defining the distance, offset &
slope
height. Additionally view position relative to a defined slope
from the line.
Grid
Define & stakeout a grid of points relative to a line.
Measure to line/Stake to line

Advertisement

Table of Contents
loading

Table of Contents