Table of Contents

Advertisement

Line levelling

A
Project:
Height difference (∆H) between
point A and B.
pacing off such that approx. the
same target distances result (d1
≈ d2; approx. 40 to 50m).
Procedure:
1. Setup instrument at I
NA2/NAK2-2.0.0en
Find Quality Products Online at:
R
V
d
d
R
V
1
I
2
1
2
I
2
2. Setup level staff vertically at
point A.
3. Aim at staff and read off and
take down height (backsight
R).
Select instrument station
4. Setup level at the
and staff location by
changepoint 2, aim at staff
and read off and take down
height (foresight V).
5. Setup level at I
at the changepoint 2 and
read backsight and take
.
1
down.
GlobalTestSupply
www.
6. Carry out a foresight at
changepoint 3.
7. Continue in the same way
until height at point B is
R
V
measured.
I
3
B
∆ ∆ ∆ ∆ ∆ H = sum backsight - sum
∆H
3
Example of the booking:
Point
No.
A
2
3
, aim at staff
B
2
Sum +6.516 -4.714
16
.com
Result:
foresight
Back-
Fore-
Height
sight R
sight V
+2.502
650.100
+0.911 -1.803
+3.103 -1.930
-0.981 651.902
∆H=
+1.802
Measuring
sales@GlobalTestSupply.com