Leica Captivate Technical Reference Manual page 759

Table of Contents

Advertisement

Understanding priori-
ties of various
heights
Stake/Check panel,
page
Roads - Road
Field
Option
Check
Editable field
height diff
The following field is shown for the Stake methods Line, Local
line, Local manual slope and Manual slope.
Use non-
Check box
perpendicu-
lar offset
Offset angle Editable field
The following fields are shown in the Line, Local line, Surface
grade and Crown methods when Show information to an addi-
tional line is checked in the Define panel.
Apply off-
Check box
sets to
additional
line
Horizontal
Editable field
offset
Vertical off-
Editable field
set
Next step
Page changes to the
Type of height
Manually entered
OR
Obtained from individ-
ual point
Use DTM height for
stakeout (toolbox: Use
heights from DTM)
From design
Show DTM height differ-
ence on Info page
(toolbox: Use heights
from DTM)
A user-definable
page exists for each of the stake methods and check
methods. Refer to the chapters from "43.3.2 Road Line - Info Page"to "43.3.8
Road DTM - Info Page".
Refer to "Road Settings,Info page" for information on all available items for the
page and how to select them.
Description
Available for Check. Vertical offset from the
reference line or surface, as defined by the
chosen method, of the point to stake.
When this box is not checked the measured
point is projected in a right angle to the
selected line.
When this box is checked, any projection
angle can be defined.
Manually defined projection angle.
When this box is checked, an offset to the
additional line can be defined.
Horizontal stake/check offset to the addi-
tional line.
Vertical stake/check height difference to the
additional line.
page.
Overrules
All other heights
Design height
No other heights
No influence on priori-
ties
For additional info only
Height offset
Considered
Considered
Considered
-
759

Advertisement

Table of Contents
loading

Table of Contents