Field
Cross-line
Radius
Slope to
point
Slope dis-
tance
918
Option
Description
Display only
Measured position left/right offset based on
the line from the current preplot point to the
given azimuth direction. Negative value is
left.
Display only
Horizontal distance from the measured posi-
tion to the current preplot point.
Selectable list
Point stored in the working job for which the
slope distance from the current measured
position is required. Useful when offsetting a
preplot point to validate cable length from
previous staked point.
Display only
Slope distance from measured position to
selected Slope to point.
Seismic Stakeout