Table of Contents

Advertisement

43.5
Description
Creating a task
Load a Defined Task/
Load a Defined Rail
Task/
Load Defined Tunnel
Task
Roads - General

Tasks

When staking out or checking a road/rail/tunnel, often it is not possible to fin-
ish a particular task in one go. The element to be staked out or checked can be
stored together with all defined settings as a work task.
Stored in a task are:
Selected layer
Working chainage
Selected line(s) or element
Shifts
Tasks are stored within the selected Road/Rail/Tunnel job. They can be created
at any time when working in the field or during preparation in the office.
Deleting a task does not delete the referenced jobs.
Deleting a Road/Rail/Tunnel job deletes all referencing tasks.
Tasks are method-specific.
1.
Start the Roads/Rail/Tunnel app.
2.
Select a method, if necessary, and press OK.
3.
In the Define panel press Save task.
4.
Type in a name for the task and press OK.
Access
Press Load in the Define panel.
Key
OK
Delete
More
Fn Name or Time
Description
To select the highlighted task and continue.
To delete the selected task.
To display information about Date, Time,
Creator and Description.
To sort task list by name or time.
685

Advertisement

Table of Contents
loading

Table of Contents