Leica Captivate Technical Reference Manual page 906

Table of Contents

Advertisement

Stake Results,
Elevations page
906
Next step
Page changes to the Coords page. This page displays the design coordinates
as well as the differences between design and measured coordinates.
Page changes to the Code page where codes can be selected or typed in.
Page changes to the Elevations page.
On this page, multiple elevations can be stored to one staked point.
Example
When measuring the centre of a manhole, the drain below may have pipelines
joining at different height levels. To store and stakeout these pipeline inverts,
additional heights can be entered. The cut and fill value will automatically be
calculated, allowing to transfer this information to the stake marker.
Key
Description
OK
To return to the stake panel. To store all values.
Last
To recall the last stored elevations and information.
Page
To change to another page on this panel.
Description of fields
Field
Option
Elevation
Editable field
Cut/Fill
Display only
Description
The entered elevation is stored with the
point and used to calculate the cut and fill
values.
Height of the point being stored
– Entered elevation
-----------------------------------------
= Cut or fill value (always positive)
Examples
For cut:
Height of the point being stored
– Entered elevation
-----------------------------------------
Result > 0
598.5672 m – 596.4856 m = 2.0816 m = cut
The displayed value is 2.0816 m.
For fill:
Height of the point being stored
– Entered elevation
-----------------------------------------
Result < 0
598.5672 m – 599.7826 m = -1.2154 m = fill
The displayed value is 1.2154 m.
Stakeout

Advertisement

Table of Contents
loading

Table of Contents