Staking/Checking The Road; The Stake/Check Panel - Leica Captivate Technical Reference Manual

Table of Contents

Advertisement

45.3
45.3.1
Stake,
page
Check panel,
page
Roads - Road
5.
to return to Stake Slope. Stake out the next catch point from this
panel.
The closer the real catch point and the approximated stakeout catch point are,
the closer the projected catch point gets to the real catch point.

Staking/Checking the Road

The Stake/Check Panel

The Stake Line is shown as example.
Only lines from the selected layer are displayed.
Colour coding
Working job data is displayed in grey. Design job data is displayed in full colour.
Selected line
Working line
Centreline
Selected line
Key
Description
Measure
For GS:
To start measuring the point being staked. The key changes
to Stop.
For TS:
To measure a distance and store distance and angles.
Stop
For GS:
To end measuring the point being staked. When Automati-
cally stop point measurement is checked in GS Quality
Control, General page recording of positions ends automat-
ically as defined by the stop criteria. The key changes to
Store. After ending the measurements, the differences
between the measured point and the point to be staked are
displayed.
Store
For GS:
To store the measured point. When Automatically store
point is checked in GS Quality Control, General page, the
measured point is stored automatically. The key changes to
Measure.
Colour
Orange
Green
Thick black
755

Advertisement

Table of Contents
loading

Table of Contents