Operation (Http Test Type View) - H3C MSR 20-20 Command Reference Manual

Msr 20/30/50 series routers
Hide thumbs Also See for MSR 20-20:
Table of Contents

Advertisement

2276
C
149: NQA C
HAPTER
Description
Example
operation (FTP test type view)
Syntax
View
Parameter
Description
Example

operation (HTTP test type view)

Syntax
View
Parameter
C
C
LIENT
ONFIGURATION
OMMANDS
Use the
nqa schedule
for a test group.
Use the
undo nqa schedule
Note that a test group is not allowed to enter test group view or test type view
after it is scheduled.
# Start a test for the test group with the administrator name admin and operation
tag test.
<Sysname> system-view
[Sysname] nqa schedule admin test start-time now lifetime forever
operation { get | put }
undo operation
FTP test type view
get: Obtains a file from the FTP server.
put: Transfers a file to the FTP server.
Use the
operation
Use the
undo operation
By default, the FTP operation type is get.
# Configure the FTP operation type as put.
<Sysname> system-view
[Sysname] nqa entry admin test
[Sysname-nqa-admin-test] type ftp
[Sysname-nqa-admin-test-ftp] operation put
operation { get | post }
undo operation
HTTP test type view
get: Obtains data from the HTTP server.
post: Transfers data to the HTTP server.
command to configure the test start time and test period
command to stop the test for the test group.
command to configure the FTP operation type.
command to restore the default.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Msr 20-21Msr 30-16Msr 30-20Msr 30-40Msr 30-60Msr 50 ... Show all

Table of Contents