STEP 56
3
2
Install the front washer hose and electrical connector
(1) and rear (2) if equipped. Install the bottle onto the
bracket (3).
STEP 57
Install the engine grid heater power cable.
STEP 58
2
3
Install the throttle position connector (1) and the ECM
power connector (2). If equipped, connect the
suspended axle position pot connector (3).
Section 10 - Engine - Chapter 1
1
RD05N119
RD05N118
1
RD05N116
STEP 59
Install a new O-ring on the charge-air cooler to intake
manifold tube assembly. Install the tube.
STEP 60
Install the bushing bolt (1). Install the clamp (2).
Tighten all hardware.
10-1-13
2
1
RD05N134
RD05N114
RD05N115