New Holland T8010 Manual page 826

Hide thumbs Also See for T8010:
Table of Contents

Advertisement

Assembly
NOTE: Always replace damaged or heavily worn
parts. If the parts are not serviceable, the entire valve
section must be replaced.
NOTE: Always install new O-rings, backup rings and
seals during assembly.
STEP 19
4
1
3
Install new backup rings and O-rings on the on the
main poppet (1) and load check body (2). Install the
main poppet and spring (3) into the load check body
and install the cap (4).
STEP 20
Install the plunger in the load check. Install the load
check assembly into the valve body and tighten the
cap to a torque of 30 to 41 Nm (22 to 30 lb. ft.).
Section 35 - Hydraulic Systems, 3PT - Chapter 4
2
RD98K201
RD02E057
35-4-9
STEP 21
Install the spring and pressure compensated flow
control spool into the valve body. Install the plug and
tighten to a torque of 50 to 58 Nm (37 to 43 lb. ft.).
STEP 22
Install a washer on each end of the main spool. Be
sure that the end of the spool with the brass plug (1)
is toward the top of the valve body (the end with the
load check cap). Install the plug and tighten to a
torque of 14 to 16 Nm (10 to 12 lb. ft.).
RD02D057
1
RD02D056

Advertisement

Table of Contents
loading

This manual is also suitable for:

T8020T8030T8040

Table of Contents