Installation
STEP 27
Position the valve sections on the valve stack and
install the three retaining bolts. Tighten the M10 bolt to
a torque of 25 to 30 Nm (18 to 22 lb. ft.). Tighten the
M12 bolts to a torque of 40 to 45 Nm (30 to 33 lb. ft.).
NOTE: Be sure that the two signal check springs do
not fall from the ports when assembling the valve
sections.
STEP 28
Install the raise and lower hydraulic tubes for the 4th
and 5th remote valve sections.
Section 35 - Hydraulic Systems, 3PT - Chapter 4
RI02E044
RI02E043
35-4-11
STEP 29
1
Connect the wiring harness to the solenoids (1).
Install the seven pin connector mounting plate (2).
2
RI02E042