Refitting The Cable Harness In The Base - ABB IRB 6700 Product Manual

Hide thumbs Also See for IRB 6700:
Table of Contents

Advertisement

4 Repair
4.4.2 Refitting the cable harness
Continued
11

Refitting the cable harness in the base

1
2
3
Continues on next page
216
Action
Refit the frame metal clamp.
Action
Use caution and run the cables down
through the protection tube in this order:
R1.MP
R1.SMB
Make sure that the cables are not
twisted. The cables shall be in line
with its position on the base plate.
Make sure that the R1.SMB will be
on the right side (seen from behind
the robot).
Make sure that the R1.MP will be on
the left side.
Make sure that the markings on the cables
are facing upwards when connected.
© Copyright 2013 ABB. All rights reserved.
Note
xx1300000542
Note
xx1300000732
xx1300000736
3HAC044266-001 Revision: -

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents