ABB IRB 6700 Product Manual page 424

Hide thumbs Also See for IRB 6700:
Table of Contents

Advertisement

4 Repair
4.7.4 Replacing the axis-4 motor
Continued
8
9
10
11
12
Connecting the motor cables
1
Continues on next page
424
Action
Push the motor carefully in position while
at the same time the motor pinion is slightly
rotated.
Make sure that the motor pinion is
properly mated to the gear of the
gearbox.
Make sure that the motor pinion
does not get damaged.
Make sure that the direction of the
cable exit is facing the correct way.
Remove the guide pins.
Secure the motor with its attachment
screws and washers.
Perform a leak-down test.
Disconnect the 24 VDC power supply.
Action
Push the motor cables in through the cable
gland opening.
© Copyright 2013 ABB. All rights reserved.
Note
Tightening torque: 35 Nm.
Screw dimension: M8x30 quality 12.9
Gleitmo (4 pcs)
xx1200001137
See
Performing a leak-down test on
page
174.
Note
xx1300000738
3HAC044266-001 Revision: -

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents