Action
Fit the o-ring.
Apply Sikaflex on the o-ring before as-
sembly.
Run the SMB/BU cables into the SMB re-
cess.
Use caution and fit the SMB/BU cover in
its hole with three attachment screws from
inside the SMB recess without damaging
the o-ring.
Note
Do not tighten the screws fully! It must still
be possible to adjust the position of the
cable harness by rotating the SMB/BU
cover in its hole a little.