ABB IRB 6700 Product Manual page 501

Hide thumbs Also See for IRB 6700:
Table of Contents

Advertisement

9
10
11
12
Concluded refitting of the front shaft
1
3HAC044266-001 Revision: -
Action
Secure the shaft with screw and washer.
Fit the VK-cover.
Unscrew both screws in link ear and fill the bear-
ing with grease from the upper hole until the
grease appears in the lower hole.
Refit the two screws and wipe clean from residual
grease.
Action
Remove the lifting accessory from the bal-
ancing device.
© Copyright 2013 ABB. All rights reserved.
4.8.2 Replacing the axis-2 gearbox
Note
Tightening torque: 200 Nm
xx1200001279
xx1200001278
Grease: 3HAC042534-001
xx1300000783
Note
Continues on next page
4 Repair
Continued
501

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents