10
11
Refitting the cable harness - lower arm
1
2
3
3HAC044266-001 Revision: -
Action
Remove the guide pins and fit the two re-
maining M12 screws.
Secure the remaining two M12 screws.
Action
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
•
air pressure supply
to the robot, before entering the robot
working area.
Tie the axis-5 and axis-6 motor cables into
bundles (if not already done), to avoid
damaging them during the continued pro-
cedure. This will also make it easier to run
the cables through the inside of the robot.
Run the upper end of the cable harness up
through the lower arm.
© Copyright 2013 ABB. All rights reserved.
4.5.4 Replacing the lower arm
Note
xx1300000659
M12, tightening torque: 115 Nm
Note
xx1300000668
xx1300000733
Continues on next page
4 Repair
Continued
321