ABB IRB 6700 Product Manual page 512

Hide thumbs Also See for IRB 6700:
Table of Contents

Advertisement

4 Repair
4.8.3 Replacing the axis-3 gearbox
Continued
2
3
4
5
6
7
8
Removing the axis-3 motor
1
Continues on next page
512
Action
Fit a lifting eye in the arm house, with a
fender washer underneath.
CAUTION
The complete upper arm (including the
wrist) weighs 200 kg.
All lifting accessories used must be sized
accordingly!
Attach the upper arm lifting accessory to
an overhead crane (or similar) and then to
the lifting eye in the arm house and in the
wrist.
Raise the lifting accessories to take the
weight of the upper arm.
In case of necessary adjustments, use the
shortening loops on the lifting accessory
(chain), making sure to place the chain the
right way through the loops!
Release the brakes in order to find the most
level lifting position of the upper arm as
possible, before lifting.
In order to release the brakes, connect the
24 VDC power supply.
Action
Before removing the motor, check that the
axis-3 gearbox is completely drained.
© Copyright 2013 ABB. All rights reserved.
Note
Lifting eye: 3HAC16131-1
Fender washer: Outer diameter: minimum
26 mm, hole diameter: 13 mm, thickness:
3 mm.
xx1200001134
Lifting accessory (chain): 3HAC15556-1
xx1200001308
24 VDC power supply
Note
3HAC044266-001 Revision: -

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents