ABB IRB 6700 Product Manual page 208

Hide thumbs Also See for IRB 6700:
Table of Contents

Advertisement

4 Repair
4.4.1 Removing the cable harness
Continued
5
6
7
8
Continues on next page
208
Action
Cut the cable tie inside the hole in the
frame.
Disconnect connectors on the SMB unit.
Unscrew the screws and washers that
holds the bracket with the SMB unit, and
remove the SMB unit.
Put the SMB unit in an ESD bag until it shall
be refitted.
© Copyright 2013 ABB. All rights reserved.
Note
xx1200001237
xx1300001114
xx1300000730
3HAC044266-001 Revision: -

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents