After All Changes Have Been Made For Mwi And Cpi; Installation And Testing - Avaya Octel 200 Installation And Maintenance Manual

Message servers
Hide thumbs Also See for Octel 200:
Table of Contents

Advertisement

10.1-46 Integration Volume
Table 10.1-5 After All Changes Have Been Made for MWI and CPI
Item
Description
1.
When you exit UPDATE after making the necessary changes,
the Octel 200/300 prompts:
FOR CHANGES TO TAKE EFFECT, SYSTEM MUST BE RESTARTED.
2.
Restart the system.
Item
Description
1.
Configure the required test extensions.
2.
Perform pre-installation testing.
3.
Install the MIC boards in the Octel 200/300 and connect the cables.
4.
Perform Adaptive Integration operational tests.
Quantity Description
2
2500-type, single line touchtone phones, one with a message waiting indicator.
1
Terminal/teleprinter directly connected to the Octel 200/300 Port J1 or SP1 via
RS-232C cable.
1
Hard copy of the Octel 200/300 configuration database.
1
Hard copy of the PBX configuration.
2
Single line analog extensions, connected to RJ11 jacks for testing.
1
Individually addressable trunk line into the PBX.
1
Mitel Superset 4 display phone. This phone is required for testing purposes only. It is
used to emulate the MIC board.
2
Modular adapters for 2500-type and Superset 4 extensions. Armiger AA2560A or
equivalent are recommended.
Octel 200/300
S.4.1
Table 10.1-6 Installation and Testing
Table 10.1-7 Test Equipment
Command
Complete
@RESTA
Complete
PB60019-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Octel 300

Table of Contents