Avaya Octel 200 Installation And Maintenance Manual page 423

Message servers
Hide thumbs Also See for Octel 200:
Table of Contents

Advertisement

8.2.8 INSTALLATION CHECKLIST
This section offers a checklist of issues relating to Octel 200/300 and to the ROLM Model 30/80 CBX.
The list is presented in the order in which the installation process should be followed. For details
regarding any topic, refer to the sections of this chapter.
Pre-Installation
Item
Description
1.
List the database. Highlight areas where changes are
required.
2.
Make note of the following definitions for each port
Number of ports
-
Port extension number
-
3.
If different company greetings will be used, enter the
access code for each route into the
able. Obtain access code numbers from ROLM
T
vendor.
4.
Set the rings before no answer to be one less than the
ring cycle set forwarding in the ROLM Model 30/80
CBX.
Item
Description
1.
List ROLM Model 30/80 CBX database and highlight areas where changes
are required.
2.
Verify that the S/W release is 9006.1 KV19 for the ROLM Model 30/80 CBX,
Model 30 or Model 80 system.
3.
Verify that the ROLM Model 30/80 CBX has the required ROLM link
channels available.
PB60019-01
Table 8.2-2 Octel 200/300 Requirements
TRUNK GROUP
Table 8.2-3 ROLM Requirements
ROLM 9751 Model 30/80 Adaptive Integration
Command
Complete
.L ALL
.L SLOT
.A TRUNK
.M INFO
Index #7
Complete
8.2-33
Octel 200/300
S.4.1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Octel 300

Table of Contents