Installation And Commissioning; Introduction To Installation And Commissioning - ABB CRB 1300 Product Manual

Hide thumbs Also See for CRB 1300:
Table of Contents

Advertisement

3 Installation and commissioning

3.1 Introduction to installation and commissioning

General
This chapter contains assembly instructions and information for installing the CRB
1300 at the working site.
See also the product manual for the robot controller.
The installation must be done by qualified installation personnel in accordance
with the safety requirements set forth in the applicable national and regional
standards and regulations.
Safety information
Before any installation work is commenced, all safety information must be observed.
There are general safety aspects that must be read through, as well as more specific
safety information that describes the danger and safety risks when performing the
procedures. Read the chapter
work.
Product manual - CRB 1300
3HAC083111-001 Revision: B
Note
Always connect the CRB 1300 and the robot to protective earth and residual
current device (RCD) before connecting to power and starting any installation
work.
For more information see:
Product manual - OmniCore C30
Product manual - OmniCore C90XT
© Copyright 2022-2023 ABB. All rights reserved.
3 Installation and commissioning
3.1 Introduction to installation and commissioning
Safety on page 15
before performing any installation
51

Advertisement

Table of Contents
loading

Table of Contents